Here are a few of the cafeteria designs created by Third Graders yesterday. They all followed the same instructions and the finished interior had to be 8,500 square feet, but some added outdoor seating and others and altered the shape of the finished building. If you take a moment to look at the directions on the screen in the upper right photo, you can interpret each design. Looking that closely, you can also spot a glaring spelling error on a design photo, but I'm cutting them some slack. Not every master builder can be a master speller.