As I’ve mentioned previously, this is a fascinating process: installing/burying new infrastructure alongside previously-installed infrastructure. These sub-contractors are digging and clearing a 2' × ½' × 1' deep hole to get eyes on the buried gas line, in preparation for drilling underground to bury conduit. The conduit will carry fiber optic cable for service with Clearwave Fiber.