Well, as predicted, I'm moving rather slowly today. Lots happened on the building front so I spent several hours at the property today overseeing things and cleaning up. The skim coat was poured and will provide a smooth clean surface for inside our 3 foot crawlspace. The perimeter pipes were installed and covered with drain rock as well as inspected by the powers that be. The water line was placed and is flowing successfully and an excavator was dropped off in preparation for backfilling on Monday.
I wandered around taking various random construction types shots. I've settled on these corn broom ones (see the other album for another version: http://365project.org/kwind/365/2013-03-08) as I liked the lighting and textures and I thought they might work for the Eye of the Beholder challenge.
hope the house comes along with minimal hiccups!